RISA Headquarters will be closed Friday, July 4th for Independence Day. We will be open at 6am PT on Monday, July 7th.

Steel Building Workshop | RISA-3D

47min

In Part 2 of the Steel Building Workshop, Ben Follett walks engineers through the basics of lateral load application and the structures lateral system (including concrete shear walls and steel braced frames).